View Single Post
Old 12-11-2008   #74 (permalink)
buzz2001
Senior Mouseketeer
 
buzz2001's Avatar
 
Join Date: Jan 2004
Location: Coronado Springs
Posts: 425
Re: buzz's CSR info thread

For anyone staying after the 19th of Dec. in Cabanas 9A you are in for a totally redone room. The whole building is empty of guests and an army of workers has begun to remodel the rooms. The rooms are being emptied totally, electric, painting, some woodwork and tile work are being performed. There has been trailers full of old furniture being taken away and the way it is being handled it is not coming back. The quiet pool was not so quiet today!

Cleaned out.
http://i10.photobucket.com/albums/a1...sney211065.jpg

This is one of the papers taped to the window of a unit. It shows the order of things to be done and by which trade. The completion date for them is the 19th.
http://i10.photobucket.com/albums/a1...sney211064.jpg

Another telling the trades the items for this room and locations in the room.
http://i10.photobucket.com/albums/a1...sney211063.jpg

This one shows a bunch of rooms with the papers in the windows and a couple of the guys.
http://i10.photobucket.com/albums/a1...sney211056.jpg
buzz2001 is offline   Reply With Quote